Answers are grounded in this paper and cite their sources.
The current collection between pantograph and contact wire is a more critical component for need to train speed up in electric railway. The basic purpose of this paper is to establish a measure of determining arc by developing an arc detector assessment system. The system was designed under conditions of EN 50317 and simulations were conducted using the developed device. According to the results, it was possible to conduct certification tests following regulations of international standards. To check the validity of our approach for the intended application, we analysis contact loss of catenary system using developed arcing measurement system in Korea. The proposed arcing measurement system is expected to enhance precision of current collection quality performance assessment methods at high-speed lines and conventional lines.
No takes yet. Share an insight, caveat, or question.
Park et al. (2012) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: