Despite the rapid spread of building information modelling (BIM), the majority of BIM projects are still conducted in a mixed-project environment: two-dimensional (2D) drawing and BIM. The design-coordination productivity and information-exchange patterns are analysed for a unique case where two towers, A and B, of a hospital project deployed two different design coordination strategies in a 2D and BIM mixed-construction environment. The tower A strategy coordinated designs using drawings as the main source of information and confirmed them using BIM (BIM-assisted coordination), whereas the tower B strategy coordinated designs using BIM and confirmed them using drawings (BIM-led coordination). The coordination productivity was 228% faster for tower B than for tower A. The frequency of design changes was much lower for tower B (0.42 times/drawing) than for tower A (2.13 times/drawing). As the result, the design coordination for tower A was delayed by 9.3 months, whereas tower B was completed rapidly and without any delay. A social network analysis revealed that the BIM-led coordination was supported by the relatively even distribution of information, the reduced control of an mechanical, electrical and plumbing (MEP) engineer over a project, and higher accessibility to the information for every project participant.
No takes yet. Share an insight, caveat, or question.
Park et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: