This study investigates and studies an integrated scheduling problem in a distributed manufacturing system that comprises multiple distributed factories, each of which has one independent flow shop with different numbers of serial machines. A stochastic multi-objective model is built with consideration of two criteria of scheduling and uncertainties of the operation process. A multi-objective brain storm optimization algorithm is designed to solve the model. Through a comparison with two state-of-the-art multi-objective algorithms, the experimental results indicate that the proposed model is effective, and the proposed algorithm can achieve satisfactory performance.
No takes yet. Share an insight, caveat, or question.
Fu et al. (2018) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: