This paper recommends a stepwise method employing learning curves (LCs) to predict the man-hour for performing activities in engineering projects. It goes beyond existing applications of LCs and debates what specific neglected issues should be included and how they can be predicted through LCs. Focusing on man-hour prediction in engineering projects through LCs is not limited to improving the human resource allocation for performing activities, where, it has significant impacts on the improvement of different issues such as labour costs, quality of engineering services, time management in engineering projects, productivity, and competition capability in tenders. This paper identifies the best-known and widely used LCs in the literature and provides analysis in a real-life engineering, procurement, and construction (EPC) contracting company. Hence, the actual man-hour data for a specified engineering activity is gathered in a number of consecutive projects and analysed to select the best fit LC for prediction.
No takes yet. Share an insight, caveat, or question.
Ebrahimi et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: