In this paper, a primary frequency control strategy based on fuzzy logic, designed for variable-speed wind generators, is proposed and tested on a 2.2 kW test bench. The fuzzy logic supervisor ensures a regular primary reserve for a large range of wind speeds without any wind speed measurement. This supervisor controls simultaneously the generator torque and the pitch angle to keep the primary reserve; it determines in real time the generator power reference value. The fuzzy logic supervisor is compared to a simpler strategy, based only on the control of the generator torque. This classical strategy ensures a regular power reserve only when the wind generator operates at full load, and the generator power reference needs to be determined previously or by the network manager. A procedure for implementing a fuzzy logic supervisor in real time is proposed. The experiments indicate the regularity of the power reserve and the ability to contribute to frequency control.
No takes yet. Share an insight, caveat, or question.
Mokadem et al. (2009) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: