Answers are grounded in this paper and cite their sources.
This paper establishes a regressive methodology, applied to the electrical distribution sector, to predict the next hour load. The approach followed is based on a Gaussian process model. To create a simple structure for the input regressor only a few
No takes yet. Share an insight, caveat, or question.
Lourenço et al. (2012) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: