Throughput evaluation of a mixed model assembly line, where the arrival sequence of items is randomly distributed, is a very difficult task, and the use of performance measures is required. An essential condition for using a performance measure is its validity. In this paper, a six-stage validity study of five alternative performance measures is carried out. The study is based on a comparison between calculated performance measures for throughput with simulation results, using the Spearman correlation coefficient. A full experimental study is developed, evaluating the validity of each measure in a wide range of problem environments. Results indicate that the performance measure based on the probability of a station becoming a bottleneck is highly correlated with simulation results, and was found to be the best measure in almost all experiments.
No takes yet. Share an insight, caveat, or question.
Joseph Bukchin (1998) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: