Prediction of cash flows during construction of large buildings is usually based on cumulative cash flow in the form of an S-curve. There have been several attempts to establish formulae for the estimation of such S-curves on an empirical basis. This paper draws an anlogy between the probability of failure in reliability theory and the probability of payment during construction to develop a general approach to possible mathematical forms of the cash flow during construction. An example of a new generalized alternative form of the S-curve known in Australia as the Bromilow S-curve is shown to be an excellent approximation to the empirical form.
No takes yet. Share an insight, caveat, or question.
Selwyn N. Tucker (1986) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: