Answers are grounded in this paper and cite their sources.
This paper presents back-analyses of a failed slope at an open pit lignite mine in Muara Enim, Indonesia. The slope, which was being raised by the dumping of excavated material, failed at a dump height of 24 m, well before reaching the design height of 80 m. The primary cause of failure was determined to be the presence of a previously unknown weak layer in the foundation, combined with high excess pore pressures generated by a relatively fast dumping rate. The failure resulted in significant disruption of the mining operation, in addition to environmental problems and a high cost of remediation. Finite element analyses were performed to gain a better understanding of the influence of the weak layer at the time of the failure. The case history emphasizes the need for a thorough site investigation and the risks associated with fast dumping on saturated weak clay overlain by a stiff residual soil layer with low permeability.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: