In the single machine scheduling problem with job delivery to minimize makespan, jobs are processed on a single machine and delivered by a capacitated vehicle to their respective customers. We first consider the special case with a single customer, that is, all jobs have the same transportation time. Chang and Lee (2004) proved that this case is strongly NP-hard. They also provided a heuristic with the worst-case performance ratio [Formula: see text], and pointed out that no heuristic can have a worst-case performance ratio less than [Formula: see text] unless P = NP. In this paper, we provide a new heuristic which has the best possible worst-case performance ratio [Formula: see text]. We also consider an extended version in which the jobs have non-identical transportation times and the transportation time of a delivery batch is defined as the maximum transportation time of the jobs contained in it. We provide a heuristic with the worst-case performance ratio 2 for the extended version, and show that this bound is tight.
No takes yet. Share an insight, caveat, or question.
Lu et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: