Authors
An approach for a large-scale unit commitment problem is presented. The unit commitment (UC) problem plays a major role in power systems, because the improvement of commitment schedules results in the reduction of operating costs. However, the unit commitment problem is one of the most difficult optimisation problems in power systems, because this problem has many constraints. Moreover, search space is vast. To overcome these problems, a new genetic operator based on unit characteristic classification and unit integration technique are proposed. The proposed algorithm was tested on a reported UC problem. From simulation results, better solutions are obtained in comparison with previously reported results. Numerical results for systems up to 100 units are compared to previously reported results.
No takes yet. Share an insight, caveat, or question.
Senjyu et al. (2003) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: