As power-transmission distances have increased, new problems, both technical and economic have been encountered, analyzed, and taken into consideration in the design and operation of power systems. As transmission distances continue to increase it is logical to expect that in addition to the already exposed problems, new ones may arise which previously have not required consideration. It is the purpose of this paper to present an analysis of a technical problem which falls in the latter category.
No takes yet. Share an insight, caveat, or question.
Peterson et al. (1943) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: