This article presents a 10-kW novel gallium-nitride (GaN)-based three-phase grid to 48-V battery energy storage system (BESS). The BESS utilizes a single-stage ac–dc dual-active-bridge (DAB) converter with dual-phase-shift (DPS) and variable-frequency (VF) control. 600- and 80-V GaN power transistors, as well as planar magnetics, are used to achieve 96.6% efficiency and 50-W/in³power density. The operation principle and power transfer characteristics are derived based on time-domain analysis of the DAB inductor current. VF and DPS are utilized to achieve power factor correction and zero-voltage switching simultaneously while minimizing the DAB rms current. An online calculation algorithm is presented with short execution time, which enables the closed-loop control of the BESS. Experimental results are presented to validate the novel control.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2021) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: