Answers are grounded in this paper and cite their sources.
Mixed-model assembly lines are used to produce many different products without carrying large inventories. The effective utilization of these lines requires that a schedule for assembling the different products be determined. For Just-In-Time (JIT) production systems, which require producing only the necessary products in the necessary quantities at the necessary times, the objective is to keep a constant rate of usage of all parts used by the line. This is called levelling or balancing the schedule. This paper develops a theoretical basis for scheduling these systems, and presents new scheduling algorithms and heuristics.
No takes yet. Share an insight, caveat, or question.
John Miltenburg (1989) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: