The ion‐exchange nitrate‐removal plant installed at Isleham, Cambridgeshire was commissioned during 1990. A description of the plant and design considerations is given, together with operational data. The nitrate‐removal plant treats up to 4.5 Ml/d of chalk borehole water. Problems encountered are presented together with information on capital and operating costs.
No takes yet. Share an insight, caveat, or question.
Andrews et al. (1994) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: