Answers are grounded in this paper and cite their sources.
This article studies the skip, under some assumptions, of process control operations. The case of one tool, one enhanced buffer and one metrology tool of a monotonic parameter is analysed. This article presents circumstances in which control plan can be optimised due to the buffer's behaviour. After discussing the industrial issue of defectivity, this article presents a literature review followed by the model and steps towards industrial development. Then demonstrator, which is applied at a case study of defectivity sampling, is presented. A test of over a 300-mm wafer fabrication data set shows serious improvements – around 35% of defectivity controls have been skipped compared to the static sampling plan.
No takes yet. Share an insight, caveat, or question.
Shanoun et al. (2010) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: