Answers are grounded in this paper and cite their sources.
Machine bottlenecks, resulting from shifting and unbalanced machine loads caused by resource capacity limitations, impair product-mix flexibility production systems. Thus, the knowledge base (KB) of a dynamic scheduling control system should be dynamic and include a knowledge revision mechanism for monitoring crucial changes that occur in the production system. In this paper, reinforcement learning (RL)-based dynamic scheduling and a selection mechanism for multiple dynamic scheduling rules (MDSRs) are proposed to support the operating characteristics of a flexible manufacturing system (FMS) and semiconductor wafer fabrication (FAB). The proposed RL-based dynamic scheduling MDSR selection mechanism consisted of initial MDSR KB generation and revision phases. According to various performance criteria, the presented approach yields a system performance that is superior to those of the fixed-decision scheduling approach, the machine learning classification approach, and the classical MDSR selection mechanism.
No takes yet. Share an insight, caveat, or question.
Shiue et al. (2020) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: