Answers are grounded in this paper and cite their sources.
Proper management of resources in construction projects can yield substantial savings in time and cost. As construction is a labor-intensive industry, this paper focuses on labor productivity in the construction industry. This study considers the current state-of-the-art issues relevant to this subject. It covers the construction labor productivity definitions, aspects, measurements, factors affecting it, different techniques used for measuring it and modeling techniques. The main outcome from the literature is that there is no standard definition of productivity. This study provides a guide for necessary steps required to improve construction labor productivity and consequently, the project performance. It can help improve the overall performance of construction projects through the implementation of the concept of benchmarks. Also, it gives an up to date concept of loss of productivity measurement for construction productivity claims. Two major case studies, from the literature, are presented to show construction labor productivity rates, factors affecting construction labor productivity and how to improve it.
No takes yet. Share an insight, caveat, or question.
Shehata et al. (2011) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: