Answers are grounded in this paper and cite their sources.
This paper presents a novel mitigation technique to reduce the effects of geomagnetically induced currents (GICs) on high-voltage power systems. The method consists of connecting switching devices at the neutral grounding connection point of transformer banks. Only one transformer bank needs to be grounded through a switch to reduce GIC in a two-terminal system. For multiterminal systems, n-1 switches are necessary and the operation is independent from each other. The switching frequency and the duty cycle are selected from a tradeoff between the effectiveness of the method and the detection of fault currents. Transient simulations on a two-bus 230/500 kV system show that the proposed switching at the neutral successfully mitigates the GIC. This proposed technique opens the door to a new family of GIC mitigation methods.
No takes yet. Share an insight, caveat, or question.
Kovan et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: