This paper addresses the single-level capacitated lot sizing problem (CLSP) with setup carryover. Specifically, we consider a class of production planning problems in which multiple products can be produced within a time period and significant setup times are incurred when changing from one product to another. Hence, there might be instances where developing a feasible schedule becomes possible only if setups are carried over from one period to another. We develop a modelling framework to formulate the CLSP with setup times and setup carryovers. We then extend the modelling framework to include multiple machines and tool requirements planning. The need for such a model that integrates both planning and lot sizing decisions is motivated by the existence of a similar problem in a paper mill. We apply the modelling framework to solve optimally, an instance of the paper mill's problem.
No takes yet. Share an insight, caveat, or question.
Gopalakrishnan et al. (1995) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: