This article presents the results of a simulation study of implementation practices for material requirements planning systems. In particular, the role of safety lead times in ensuring effective delivery performance is analysed and some general guidelines are suggested.
No takes yet. Share an insight, caveat, or question.
Melnyk et al. (1981) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: