Providing electricity for the residential buildings which devote a high portion of energy consumption is very crucial all over the world. Not only electrical loads but also heating and cooling loads are required to be supplied in a building. The aim of this paper is to supply cooling, heating, and electrical loads in a building by separating generation system and cogeneration system. In this regard, the optimal problem was developed to minimize the total costs using particle swarm optimization algorithm. As a numerical study, a high-rise building with 72 units located in Kerman is analyzed for eight different scenarios.The results show that in order to supply cooling, heating, and power, a cogeneration system consisting of a 195 kW micro gas turbine as prime mover, a 281 kW single-effect absorption chiller, a 439 kW air cooling compaction chiller, an 187 kW auxiliary boiler to compensate the heat load, and a 52.8 kW photovoltaic to generate employed electrical loads, is the best optimal system to supply the base building loads. In this optimized system, the annual electricity sales revenue is 93,251$, the annual cost of buying power is 7001$, the cost of buying fuel as annual consumption is 15,852.4$, and the annual production of carbon dioxide emissions in the building is 229.78 tons. The return on investment period for the aforementioned project is also estimated 4.98 years.
No takes yet. Share an insight, caveat, or question.
Farshid Keynia (2018) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: