Re-manufacturing is recycling by manufacturing as-good-as-new products from used products, often involving disassembly, cleaning, testing, part replacement/repair, and re-assembly operations. Production planning and inventory control is one of the most important research issues for re-manufacturing system, which are faced with a greater degree of uncertainty and complexity. This leads to a critical need for planning and control systems designed to deal with the added uncertainty and complexity. We formulate a stochastic dynamic programming based model to study the production planning, i.e. dynamic lot sizing problem, of re-manufacturing systems. In the model the demand and return amounts are stochastic over the finite planning horizon. The objective is to determine the quantities that have to be re-manufactured at each period in order to minimise the total cost, including re-manufacturing cost, holding cost for returns and re-manufactured products and backlog cost. The optimal production plan of the re-manufacturing system over a finite planning horizon can be obtained with the policy iteration method. In the end, a numerical example is performed to illustrate how the model is applied and to prove its feasibility.
No takes yet. Share an insight, caveat, or question.
Li et al. (2008) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: