After the routing of a primary distribution system has been established, the system needs to be designed in detail-switches and protection devices must be placed, automation schemes must be decided upon, etc. This design stage has a critical impact on the reliability and cost of a distribution system. This paper proposes an economic criterion for this design stage, compares several automated design methods, and identifies the algorithm best suited for distribution system reliability and cost optimization. This method is then applied to an existing utility distribution feeder and the results are discussed.
No takes yet. Share an insight, caveat, or question.
Brown et al. (1997) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: