Answers are grounded in this paper and cite their sources.
This paper presents a day-ahead coordinated scheduling method of hydro and wind power generation systems (HWPGSs) with consideration of uncertainties. In this method, we first formulate the coordinated scheduling model with two-part price and power flow constraints, which manifests the fixed and variable economic benefits as well as the secure operation of HWPGS, respectively. Then, the interval analysis is used to study the effect of uncertain wind power, water inflow, and electricity load on the coordinated scheduling model. Finally, we use a real test system in a western area of China to conduct simulation studies, which verify the effectiveness of the interval analysis and the effect of price mechanism on the day-ahead coordinated scheduling of HWPGS.
No takes yet. Share an insight, caveat, or question.
Li et al. (2019) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: