The Bosphorus Tube Tunnel beneath the Bosphorus Strait is under construction in Istanbul, Turkey, using the tunnel-element immersed method. It is well known that the Bosphorus Strait has a two-layer current system with a rapidly changing flow. To maintain quality and safety of tunnel-element installation, it is important to accurately forecast the current-flow condition for periods of 48h to identify windows of opportunity for the element-immersion process. In this study, a forecast system is developed based on the information collected and analyzed over an immediate past five-day period (120h) to provide a two-day (48h) period current prediction required for the element-immersion process. The system consists of a water-level forecast model and a current forecast model. The water level is forecasted from air pressure and wind information obtained from on-line monitoring data and meteorological service forecasts. The current is then forecasted from the water-level data taking the two-layer density interface effect and the immediate preceding 120-h current data (including its concurrent value) into consideration. This selected data-analysis period is determined based on our operational experience at the site. Both models are statistically constructed and calibrated using a year-long observation data set (October 2004–September 2005). It is found that the proposed forecast system gives sufficiently accurate current information for safe ongoing marine construction operation.
No takes yet. Share an insight, caveat, or question.
ODA et al. (2009) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: