Authors
This paper explores unplanned-maintenance needs regarding rail track geometry degradation using a logistic regression approach. The authors conducted an exploratory statistical analysis using the inspection records from the Portuguese Infrastructure Manager in order to predict the probability that a given track section needs unplanned maintenance depending on the planned-maintenance indicators proposed by the European Standard EN 13848, and on other explaining variables such as the presence of bridges and switches. The main conclusions are that the typical planned-maintenance criteria (the standard deviations of longitudinal-levelling and of horizontal-alignment defects) are statistically significant predictors of unplanned-maintenance needs. Moreover, for some speed groups and quality levels, the presence of bridges and switches is also statistically significant. These findings contribute to a quantified understanding of the underlying trade-off between planned-maintenance and unplanned-maintenance needs in the current suggested limits contained in the standard EN 13848.
No takes yet. Share an insight, caveat, or question.
Andrade et al. (2013) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: