This paper presents a branch-and-bound enumeration scheme for the makespan minimization of the permutation flow shop scheduling problem with sequence-dependent setup times. The algorithm includes the implementation of both lower and upper bounding procedures, a dominance elimination criterion, and special features such as a partial enumeration strategy. A computational evaluation of the overall scheme demonstrates the effectiveness of each component. Test results are provided for a wide range of problem instances.
No takes yet. Share an insight, caveat, or question.
Ríos‐Mercado et al. (1999) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: