This is the authors' abstract. We don't add key points for this paper.
The article presents the Building Information Modelling (BIM) and their data collection capabilities. We introduce what parameters can be measured. We compare the control card, remote I/O, PLC, DCS and SCADA control and process control systems to see which is worth using in a building information system. The research examines the measurement system’s ability to pre-process data that will help relieve the burden on the expert system. Currently available BIM systems can be optimized and developed using various mathematical models. The use of process control systems can perform not only measurement and data processing, but also logging and alarm management processes.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Móré et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: