This paper presents algorithms for finding solutions and planning horizons to two related T period, one product, deterministic production problems with capacity constraints and penalty costs for unsatisfied demand. The algorithms are derived from an application of Lagrangian techniques to problems with inequality constraints.
No takes yet. Share an insight, caveat, or question.
Eppen et al. (1968) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: