This paper describes a short-term hydro generation optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to maximize hydropower production, given the beginning-of-study content of each reservoir and the end-of-study contents of the reservoirs with long-term storage. The optimal hydro scheduling problem is formulated as nonlinear programming with linear constraints and is solved by a direct search procedure. A cycling module is used to estimate the end-of-study contents of the reservoirs with short-term storage and the discharge delay releases from upper reservoirs, and then a transition module is solved to obtain the optimal generation scheduling. The system model is already operational for large-scale hydro systems, and currently is being used by FEPCL’s operation engineers to determine hourly or half-hourly generation schedules over a period of up to three days.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2004) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: