Develops a simulation-based framework for forecasting carbody acceleration in integrated station-bridge buildings, suggesting efficiency improvements.
Large integrated station–bridge buildings combine track-bearing members, station floors, transfer structures, columns, and urban-rail facilities within a single coupled structural system. For such buildings, refined train–track–station dynamic simulations can reproduce train-induced vibration, but repeated time-history analysis remains costly when many operating conditions must be screened. This study develops a simulation-based response-database framework for multi-horizon forecasting of front-end carbody vertical acceleration (FCVA), defined here as the vertical acceleration at the front-end floor evaluation point of the leading carbody, in the integrated station–bridge building of Yichang North Railway Station. The project-specific database contains 700 operating cases constructed from 100 Latin-hypercube-sampled combinations of a dimensionless track-spectrum amplitude multiplier (TSA), structural damping ratio (DR), and track-spectrum initial moving position (TSIP), each evaluated at seven train speeds. With a sampling interval of 0.002 s, supervised samples were constructed using a 200-point historical window, and prediction horizons from 20 to 300 steps (0.04–0.60 s) were evaluated under a case-level split. Classical regression, tree ensembles, a multilayer perceptron, recurrent networks, a temporal convolutional network, and a Transformer were compared after automated hyperparameter selection. For the 20-step task, Extra Trees achieved the best performance, with a root mean squared error (RMSE) of 0.00336 m/s2 and R2 = 0.9958. In the independently refitted reference-fixed horizon experiment, Extra Trees retained R2 = 0.9526 at the 300-step horizon, while the temporal convolutional network (TCN) RMSE increased from 0.00394 to 0.01502 m/s2. The results show that the response database preserves exploitable short- to medium-range dynamic continuity, although phase drift and peak-timing uncertainty increase as the forecast horizon becomes longer. Parameter analysis indicates that train speed dominates both response energy and forecast error, whereas TSA mainly affects amplitude-related response metrics. On a common central processing unit (CPU) platform, the saved Extra Trees model processed 10,000 held-out windows in 0.1404±0.0008 s. The proposed method provides a computationally efficient response-screening and post-processing layer for design-stage assessment and operating-scenario comparison within the modeled parameter domain, complementing rather than replacing refined dynamic simulation and field validation.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: