A novel line balancing problem is considered. It differs from assembly line balancing problems in that the operations of each workstation are partitioned into blocks of simultaneously executed (parallel) operations. The blocks of each workstation are executed sequentially. For the line design stage considered in this paper, the compatibility (inclusion and exclusion) constraints for grouping operations into blocks and workstations as well as precedence constraints are known. The goal is to minimize a weighted sum of the number of workstations and the number of blocks while achieving a desired cycle time and satisfying all the constraints. The developed exact and heuristic methods are based on a mixed-integer programming approach. Experimental results are reported.
No takes yet. Share an insight, caveat, or question.
Dolgui et al. (2006) studied this question.