In this article, a multivariate synthetic control chart is developed for monitoring the mean vector of a normally distributed process. The proposed chart is a combination of the Hotelling's T 2 chart and Conforming Run Length chart. The operation, design, and performance of the chart are described. Average run length comparisons between some other existing control charts and the synthetic T 2 chart are presented. They indicate that the synthetic T 2 chart outperforms Hotelling's T 2 chart and T 2 chart with supplementary runs rules.
No takes yet. Share an insight, caveat, or question.
Ghute et al. (2008) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: