A multiobjective programming analysis of the operations of the Aswân High Dam is developed using an historical sequence (1871–1976) of monthly inflows as inputs to a simulation process. The trade-offs between hydroelectric energy generation, agricultural water needs, and environmental degradation from river scouring are examined. Production of short-term (three to four months) peak hydropower output is also evaluated.
No takes yet. Share an insight, caveat, or question.
Guariso et al. (1980) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: