The main contribution of this paper is the development of a multi-objective FMS scheduler which is designed to maximally satisfy the desired values of multiple objectives set by the operator. For each production interval, a decision rule for each decision variable is chosen by the FMS scheduler. A competitive neural network is applied to present fast but good decision rules to the operator. A unique feature of the FMS scheduler is that the competitive neural network generates the next decision rules based on the current decision rules, system status and performance measures. A commercial FMS is simulated to prove the effectiveness of the FMS scheduler. The result shows that the FMS scheduler can successfully satisfy multiple objectives.
No takes yet. Share an insight, caveat, or question.
Min et al. (1998) studied this question.