The paper describes UIC methodology and a technique used by Slovakian infrastructure managers for estimating railway capacity and proposes a new approach to evaluating the capacity consumption of a track line (occupation time) based on the graphic approach. The new methodology concerns for the assessment of infrastructure occupation time and is a conceptual framework developed by the authors for an easier evaluation of occupation time in the train traffic diagram.
No takes yet. Share an insight, caveat, or question.
Gašparík et al. (2010) studied this question.