Engineering case study demonstrates component-level factory acceptance testing and multi-code certification for a 2-MWe supercritical carbon dioxide system, indicating a viable deployment pathway.
This study presents the system-level engineering implementation and component-level Factory Acceptance Testing (FAT) of a 2-MWe-class supercritical carbon dioxide (sCO 2 ) waste heat recovery (WHR) power system. A partial heating cycle was adopted for a multi-MW gas-engine exhaust stream, and the compander, heat exchangers, and process skid were designed and fabricated for high-pressure CO 2 operation. Because dedicated sCO 2 -specific industrial design codes are not yet established, a multi-code certification strategy was developed by combining PED, ASME, API, and KGS requirements, while HAZOP-based safety engineering was incorporated into the final system design. The FAT confirmed the fabrication quality, pressure integrity, mechanical integrity, leak-test acceptance, and code compliance of the major equipment and process skid prior to field installation. The compressor was additionally verified through a component-level high-pressure closed-loop CO 2 test at a representative subcritical inlet condition of 28 °C and 8 MPa. This condition lies near the vapor dome, close to the critical point, and the test confirmed that a staged start-up strategy enables stable compressor operation in this near-critical region. The turbine was mechanically verified through an API 617 mechanical run test, and the heat exchangers and process skid satisfied hydrostatic pressure testing, leak testing, non-destructive examination, and structural verification requirements. The results document a practical certification-to-FAT engineering pathway for preparing an MW-scale sCO 2 WHR system for installation and subsequent commissioning. This work should be interpreted as FAT-stage engineering verification rather than integrated system performance validation; net power generation, cycle efficiency, heat recovery performance, turbine aerodynamic performance, and long-term reliability remain to be evaluated during future Site Acceptance Testing (SAT), integrated commissioning, and field operation.
No takes yet. Share an insight, caveat, or question.
Kim et al. (2026) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: