Answers are grounded in this paper and cite their sources.
We consider an assembly line with m stations in series having finite capacity buffers. Blocking occurs when buffers are full. There are M different types of products to be assembled, each with its own processing requirements. There is a production target set for each type. The problem is to operate the line to maximize throughput. We propose heuristic approaches to this problem based on an equivalent maximum flow problem and on critical path techniques.
No takes yet. Share an insight, caveat, or question.
McCormick et al. (1989) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: