We develop a simple O(n log n) solution method for the standard lot-sizing model with backlogging and a study horizon of n periods. Production costs are fixed plus linear and holding and backlogging costs are linear with general time-dependent parameters. The algorithm has linear [O(n)] time complexity for several important subclasses of the general model. We show how a slight adaptation of the algorithm can be used for the detection of a minimal forecast horizon and associated planning horizon. The adapted algorithm continues to have complexity O(n log n) or O(n) for the above-mentioned subclasses of the general model.
No takes yet. Share an insight, caveat, or question.
Federgruen et al. (1993) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:
More from Naval Research Logistics (NRL)