Answers are grounded in this paper and cite their sources.
This study questions whether Performance Measurement Systems (PMSs) defined under the New Public Management (NPM) logic fit the needs of hybrid settings where inter-organizational relationships exist between multiple actors in charge of service delivery. After outlining the key characteristics of an NPM-based PMS and its limitations in hybrid settings, an exploratory case study was carried out on a public network in charge of delivering a local public transport service. The network was particularly appropriate, as it initially endorsed an NPM-based PMS. Findings show problems in using the PMS and adapting the model, which led to the development of new features and requirements. Using a theoretical triangulation, it was possible to draw a more general insight into the characteristics of a PMS in a hybrid setting, here called a relational and participative PMS.
No takes yet. Share an insight, caveat, or question.
Agostino et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: