This paper investigates the optimal placement of micro-phasor measurement units (μPMUs) and smart meters (SMs) in microgrids (μGs). The optimal placement problem is formulated as a mixed-integer linear programming problem in which the major constraint is to maintain the observability at steady state and contingencies. We apply the Benders decomposition to this optimization problem in which a master problem and two subproblems are considered in order to lessen the dimensional and computational complexities of the proposed optimization model. The master problem identifies the optimal locations of SMs and μPMUs. Subproblems I and II satisfy μG observability constraints at steady state and contingency conditions, respectively. In the case of any subproblem violations, appropriate infeasibility cuts are produced and added to the master problem. The steady state observability analysis using SM data is a nonlinear model which is linearized in μG studies for accommodating SM and μPMU data. For the observability assessment in contingencies, a linear model which considers μPMU locations is developed. The proposed method is tested on a 33-bus test μG and comprehensive simulation studies are presented for validating the effectiveness of the proposed method for various μG configurations.
No takes yet. Share an insight, caveat, or question.
Teimourzadeh et al. (2017) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: