Answers are grounded in this paper and cite their sources.
Motivated by a problem commonly faced by time-sensitive product manufacturers, an analytical model to study the joint decisions of subcontracting and detailed job scheduling is proposed. In the proposed model, a manufacturer operates in a make-to-order fashion and receives a set of orders from its customers at the beginning of the planning horizon. The orders can be either processed by the manufacturer in-house or subcontracted to one of several available subcontractors, possibly at a higher cost. The manufacturer needs to determine which orders should be produced in-house and which orders should be subcontracted. Furthermore, it needs to determine a production schedule for the orders to be produced in-house. The objective is to minimize the total production and subcontracting cost, subject to a constraint on the maximum completion time of the orders. We analyze the computational complexity of the model, develop a heuristic for solving it and analyze worst-case and asymptotic performances of the heuristic. We also study the value of subcontracting by comparing our model and a model where no subcontracting option is available to the manufacturer. Computational results demonstrate that the subcontracting option gives the manufacturer a significant performance improvement. Related managerial insights are also provided.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: