Most (if not all) available control theories assume that a control structure is given at the outset. They therefore fail to answer some basic questions that a control engineer regularly meets in practice (Foss 1973): 'Which variables should be controlled, which variables should be measured, which inputs should be manipulated, and which links should be made between them?' These are the questions that plantwide control tries to answer.
No takes yet. Share an insight, caveat, or question.
Larsson et al. (2000) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: