The drum–buffer–rope (DBR) is a scheduling mechanism under the Theory of Constraints (TOC) philosophy. In DBR, ‘drum’ is a production schedule on the capacity-constrained resources (CCRs), which controls the speed of production for the whole system; ‘rope’ is a mechanism to release the required material to the CCRs; and ‘buffer’ is used to protect the CCRs from starvation due to statistical fluctuations. For a non-identical parallel machine flow-shop environment, estimating an efficient rope and time buffer for DBR implementation is not an easy task because of the complexity of non-identical parallel machine loading. This paper proposes a new scheduling method, which is called the modified DBR (MOD-DBR). It applies a backward finite capacity scheduling technique, including machine loadings and detail scheduling, instead of the rope mechanism in DBR. The scheduling performances of MOD-DBR are evaluated under variable processing time situations. The experimental results indicate that the MOD-DBR without a time buffer outperformed the DBR with a considerable level of buffer on the average flow time, while they have the same performance on tardiness, constraint resource utilization, and throughput.
No takes yet. Share an insight, caveat, or question.
Sirikrai et al. (2006) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: