Risk and uncertainty is endemic to life cycle costing, and requires that an effective risk management system be an integral part of life cycle cost analysis. Such a system is developed, with emphasis on sensitivity and probability analysis. Its use is demonstrated by means of a case study of building finishes.
No takes yet. Share an insight, caveat, or question.
Flanagan et al. (1987) studied this question.