Answers are grounded in this paper and cite their sources.
Lot streaming is the process of splitting a job or lot to allow overlapping between successive operations in a multistage production system. This use of transfer lots usually results in a substantially shorter makespan for the corresponding schedule. In this paper, we study the discrete lot streaming problem for a single job in no-wait flow shops. We present a new linear programming formulation for the problem. We show that the optimal solutions are the same for the m 2 2 case with or without no-wait constraints. We also present a fast, polynomial-time solution method for this case. For the general case, we prove that any solution which is 'close' to the continuous optimal solution will be a good approximation for the discrete problem. This property allows us to present two quickly obtainable approximations of very good quality.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2003) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: