One of the main problems in EHV and UHV systems is the control of transient overvoltages of internal origin. The first part of this paper investigates different approaches to limit over- voltages due to line energization and reenergization; the second part deals with fault and fault-clearing overvoltages. Finally, the relative severity of the former type of overvoltage versus the latter in EHV and UHV systems is compared.
No takes yet. Share an insight, caveat, or question.
Clerici et al. (1970) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: