Reliability analysis reveals a 10th-percentile emergency time reserve of 105.40 minutes in bulk carrier liquefaction casualties, highlighting critical windows for bridge-team emergency response.
Liquefaction and dynamic separation of moisture-sensitive solid bulk cargoes may remain latent for much of a voyage and then manifest as a sustained heel, leaving a comparatively short interval for emergency action. This study develops an exploratory reliability-based analysis of accident chronology using a source-traceable registry of 35 casualties and incidents. Eighteen cases provided post-heel information suitable for the principal emergency time reserve analysis; the observations comprised exact, approximate, reconstructed, interval-censored, and right-censored times. Descriptive statistics calculated from the selected central values and censoring bounds yielded a mean emergency time reserve TR of 200.99 min, a median of 192.20 min, and a range of 67.50–335.10 min. In likelihood-based fitting that retained censoring, the Weibull model achieved the lowest AIC (212.51) and BIC (215.18), with Kolmogorov–Smirnov D = 0.097 (p = 0.989). The fitted lower-tail quantiles were Q10 = 105.40 min and Q25 = 147.99 min, substantially shorter than the descriptive mean. Robustness was examined using nonparametric estimators, Akaike-weighted model averaging, source-confidence weighting, leave-one-out analysis, and alternative interval assumptions. The contribution is a reproducible framework for converting heterogeneous casualty narratives into uncertainty-qualified lower-tail time-reserve evidence and non-prescriptive bridge–team decision support. The framework is not a physical stability model and cannot replace ship-specific GM/GZ calculations, approved loading and stability information, or the master’s judgement.
No takes yet. Share an insight, caveat, or question.
Kubrin et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: