Answers are grounded in this paper and cite their sources.
The Laplace transform and Input-Output Analysis have been used to formulate a theoretical basis for Material Requirements Planning (MRP). In this paper, as a first step to incorporating capacity limitations into this theory, we introduce alternative formulations of a model for capacity-constrained production-inventory systems in a deterministic environment applying the same approach. We focus our attention on the way in which the balance equations constraining the system need to be modified. A numerical example is given to explain the model.
No takes yet. Share an insight, caveat, or question.
Grubbström et al. (2000) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: